Gneral Civil works with Kuwait Energy Company (KEC) this project including provide following services :
|
1 |
Excavation of the Earth Soil without secondary shifting for small ditch and pit; (by machine) |
|
2 |
Excavation of the Earth Soil with secondary shifting for wide ditch and big pit; (by machine) |
|
3 |
Manual excavation. (objects underground) |
|
4 |
Borrowed Soil transportation within 20 km distance |
|
5 |
Borrowed Soil transportation more than 20 km distance |
|
6 |
Gravel and stones to supply (including gravel source, transportation to B9 oilfield) |
|
7 |
Sand to supply (including sand source , transportation to B9 oilfield) |
|
8 |
Earth/Gravel and sand backfilling and compaction (95%) (including watering, rolling) |
|
9 |
Portland Cement: Type I General purpose |
|
10 |
Portland Cement: Type II Moderate sulfate resistance |
|
11 |
Portland Cement: Type III High early strength |
|
12 |
Portland Cement: Type IV Low heat of hydration (slow reacting) |
|
13 |
Asphalt Road |
|
13.1 |
Tack coat (for asphalt road) |
|
13.2 |
Asphalt pavement (6cm) (including asphalt concrete and compacting) |
|
14 |
Concrete road (concrete 10cm) |
|
15 |
Walkway road with road tile |
|
16 |
Provide and install the HDPE impermeable membrane(1.0mmTHK) |
|
17 |
Provide and lay the Sand layer of Flood Protection Dam. (see EXABIT-2) |
|
18 |
Provide and lay the Gravel layer of Flood Protection Dam.(see EXABIT-2) |
|
19 |
Provide and construct the Brick wall(H=1.0m,W=370mm) |
|
20 |
Provide and construct the Brick wall(H=2.0m,W=370mm) |
|
21 |
Provide and construct the Brick wall(H=2.5m,W=370mm) |
|
22 |
Provide and construct the Brick wall with surface motar(H=1.0m,W=370mm) |
|
23 |
Provide and construct the Brick wall with surface motar(H=2.0m,W=370mm) |
|
24 |
Provide and construct the Brick wall with surface motar(H=2.5m,W=370mm) |
|
25 |
Provide and construct the Brick wall with tiles on surface(H=2.0m,W=370mm) |
|
26 |
Provide and construct the Brick wall with tiles on surface(H=2.5m,W=370mm) |
|
27 |
C15 lean concrete work, include concrete supply, formwork and pouring,curing |
|
28 |
C25 lean concrete work, include concrete supply, formwork and pouring,curing |
|
29 |
C30 lean concrete work, include concrete supply, formwork and pouring,curing |
|
30 |
A36 steel (for reinforced concrete work) |
|
31 |
C25 reinforced concrete work, include concrete supply, rebar, formwork and pouring,curing |
|
32 |
C30 reinforced concrete work, include concrete supply, rebar, formwork and pouring,curing |
|
33 |
C40 reinforced concrete work, include concrete supply, rebar, formwork and pouring,curing |
|
34 |
Provide and construct the C30 concrete T-Wall. see EXABIT-5 |
|
35 |
Wire link fence with barbed wire on top (H=2.5m), details see EXABIT-6 |
|
36 |
Link Fence Drive gate(w=6.3m), details see EXABIT-6 |